FMV is not fair
ITAD Excellence

FMV is not fair

For an industry such as ITAD, RFPs are inefficient and ineffective. The RFP is an outdated method that can no longer support changes in our industry. An optimized ITAD program brings average savings of a 28% reduction in freight costs and fees and generates 18% more in value recovery.

Read More »
My title