FMV is not fair

Posted on June 2nd, 2020 by Kyle Marks

For an industry such as ITAD, RFPs are inefficient and ineffective. The RFP is an outdated method that can no longer support changes in our industry. An optimized ITAD program brings average savings of a 28% reduction in freight costs and fees and generates 18% more in value recovery.

Read More

RIP RFP

Posted on April 13th, 2020 by Kyle Marks

For an industry such as ITAD, RFPs are inefficient and ineffective. The RFP is an outdated method that can no longer support changes in our industry. An optimized ITAD program brings average savings of a 28% reduction in freight costs and fees and generates 18% more in value recovery.

Read More